Last quarter not as much got done as I would have liked but I figure if I didn't have them on my list I don't think I would have pushed to finish what I did. Linking up for the Finish Along over at She Can Quilt
1. String Heart-Wedding gift - Updated - Finished
This was on here last month but I did get the top done and recently just finished piecing the back with free piecing the date of the wedding. I love that! The wedding is in August so this is a must do and would prefer to have it done in July.
2. Bee Blocks from the MMQG Update made 1 more block
I think I need one or two more blocks then I need to sew together. I would love to finish this one!
3. X and Plus Scrap Quilt- No Progress
I need at least 10 more blocks. This one always gets pushed aside but I would really like it done.
4.Tula Pinks City Sampler Update-Progress but not done- No t-shirt
Started this last quarter and thought I could keep up but nope behind and at my local quilt shop if I have them done by sometime in September there is a pin and a t-shirt in it. That is my motivation and they are really fun to work on and sew!
I am stopping here. I know I will get number one done but I also have a quilt challenge to do by October 1 and I haven't even started that yet. No pattern and I haven't bought the challenge fabric yet. I have pinned lots of inspiration!
I need to get busy sewing!
Love #2 and #3 - looking forward to see them finished!!
ReplyDelete